How often does the dry-type transformer be overhauled? What are the maintenance contents?

AddTime:2017-11-11 13:46:21   Views:     【 Big Mid Small 】   Print   Close

 Baoding dry type transformer is one of the important electrical equipment, power transmission, power supply in the electric power industry, baoding dry type transformer using proportion is becoming more and more big, has been widely used in power stations, factories, hospitals and other almost all electrical. Then, after the baoding dry type transformer is put into use, how often does the dry transformer overhaul? What about the overhaul? Introduction of baoding dry transformer manufacturers:

 

The maintenance and maintenance of the baoding dry type transformer is provided with regulations and requirements. How often does the dry-type transformer be overhauled, and the installation and use of the transformer is of great relevance. In the dry and clean installation site, the baoding dry type transformer shall be inspected and repaired for a year or more. However, when the air contains a lot of dust, salt fog, oil smoke and other places, baoding dry type transformer inspection time should be shortened appropriately. It is important to know that these adverse environmental sites have a great impact on the operation of the baoding dry transformer, and the regular maintenance inspection can improve the service life of the equipment.

 

Now, let's take a look at the main contents of the maintenance of the baoding dry transformer.

 

1. Before the overhaul, the power failure must be made and the gates should be closed. All terminals of high and low voltage shall be short circuited and grounded to ensure safety.

 

2. If there is too much dust gathering, remove it in time to ensure air circulation and avoid insulation breakdown due to creepage.

 

3. Carefully check whether the fastener and fittings are loose; Rust and corrosion of conducting parts, site and other parts; Whether there are creepage marks and carbonization on the insulation surface.

 

4. It is necessary to check the temperature controller and the fan work.

 

5. Check whether there is dust in the vent hole of the protective shell and handle it accordingly.

 

Billion in baoding electric materials co., LTD is specialized in the production of transformer baoding transformer factory manufacturers, with professional production equipment, hoisting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.

The company's main products: baoding dry type transformer, baoding box transformer, baoding oil immersed transformer, baoding high and low voltage complete equipment, etc. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.


Prev:What should be done before and after the operation of the dry-type transformer?    Next:How to select suitable insulation materials for dry-type transformer maintenance?
Back To Top
Copyright ? Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.  All Rights Reserved    Hebei ICP prepared 11024928-2    

冀公網(wǎng)安備 13060802000181號