What should be done before and after the operation of the dry-type transformer?

AddTime:2017-11-09 16:43:58   Views:     【 Big Mid Small 】   Print   Close

 The baoding dry type transformer is an important power equipment in the power industry. After the installation of the dry-type transformer, it can not be put into use immediately, and the staff must do the necessary inspection and maintenance work. Before and after the operation of the baoding dry transformer, what should the staff do? Baoding dry type transformer manufacturers to organize the introduction:

 

1. Prior to the operation of the baoding dry transformer, the following inspection should be done:

 

1. Check whether all fasteners and connectors of baoding dry transformer are loose.

 

2. Check whether there are foreign bodies in the transformer room.

 

3. Check whether the transformer fan and temperature controller are in place and can work normally.

 

4. Check the clamping of transformer and whether the shell is permanently grounded.

 

The following problems are noted in the operation of baoding dry transformer:

 

First of all, before the operation of the baoding dry transformer, the connection plate of the adjusting pressure tap is put on the mark on the nameplate and transferred to the appropriate position.

 

Secondly, after the operation, the load should be increased gradually from less to more, pay attention to observation, and check if there are abnormal sounds or sounds.

 

Finally, it is important to observe whether there is a dampness problem when the transformer is out of operation. If the device is not damp, it can be directly relaunched into operation. If the transformer is exposed to moisture or condensation, it needs to be dried before it can be put into operation again.

 

Above is baoding dry type transformer manufacturer to sort out before and after the introduction of dry type transformer is put into operation key points and matters needing attention of work to do, users in the use of dry type transformer is necessary to pay attention to the above matters, it is necessary to guarantee the safe operation of the dry type transformer work, must not careless.

 

Billion in baoding electric materials co., LTD is specialized in the production of transformer baoding transformer factory manufacturers, with professional production equipment, hoisting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.

The company's main products: baoding dry type transformer, baoding box transformer, baoding oil immersed transformer, baoding high and low voltage complete equipment, etc. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.


Prev:What is the operating temperature of the dry-type transformer?    Next:How often does the dry-type transformer be overhauled? What are the maintenance contents?
Back To Top
Copyright ? Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.  All Rights Reserved    Hebei ICP prepared 11024928-2    

冀公網(wǎng)安備 13060802000181號