What faults will occur in the operation of dry transformers

AddTime:2018-12-21 16:05:36   Views:     【 Big Mid Small 】   Print   Close

1. What will happen to the thermostat during operation? How to solve it?

During the operation of temperature control, there may be no over-temperature alarm (or no alarm if the alarm temperature exceeds the alarm temperature), no over-temperature tripping (or no tripping if the tripping temperature exceeds the tripping temperature) and other phenomena. At this point, it is necessary to check whether the thermostat setting temperature value is accurate and whether the temperature measuring elements are placed accurately after the baoding dry transformer stops operation. If not accurate will set the thermostat reset, the thermostat temperature sensor reposition. In case of any other situation, please contact the customer service department of the company.

2. What faults will happen to the wind machine during operation? How to solve it?

When the fan may not work, check whether the fan control line and power line are connected correctly and adjust. For other cases, please contact customer service department of the company to solve.

3. How to solve the problem of high noise of products in power-on operation?

Check whether the iron core is clamped, if not clamped, the iron core should be clamped. Check whether the input voltage is consistent with the corresponding wiring terminal. If the input is 10500V and the high-voltage side tap is at 10000V, the noise will be high.

4, the product in the field of power frequency withstand voltage test, the call can not pass, how to solve?

Check whether the transformer is clean. If not, clean it. Check whether the coil of baoding dry-type transformer is shifted during transportation. If it is, it should be adjusted.

Baoding dry transformer is a kind of static electrical equipment, is used to convert a certain value of alternating voltage (current) into the same frequency of another or several different values of voltage (current) equipment. The power transformer of energy saving is amorphous alloy core distribution transformer.

Baoding zhongyi electric material manufacturing co., ltd. is a professional transformer manufacturer in baoding transformer factory, with professional production equipment, lifting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.


The company's main products: baoding dry transformer, baoding box transformer, baoding oil-immersed transformer, baoding high and low voltage complete sets of equipment. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.


Prev:Specification for safe operation of oil-immersed transformers    Next:Promotion and application of dry power transformer
Back To Top
Copyright ? Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.  All Rights Reserved    Hebei ICP prepared 11024928-2    

冀公網(wǎng)安備 13060802000181號