Baoding oil-immersed transformer installation of security is the basis of guarantee the safe operation of the power system, therefore, in order to protect the safety of baoding oil-immersed transformer installation, in baoding oil-immersed transformer must be prepared before installation work. So what should be done before oil immersed transformer installation? The following oil immersed transformer supplier is introduced in detail.
The preparation before the installation of the baoding oil immersed transformer shall have the following contents:
I. time quota.
According to the national quota standard, the integrated labor day for ontology installation is 21 days. The working days required for debugging are calculated separately.
2. Installation site layout.
Transformer installation site must be easy to transport, road flat, have enough width, the ground should be solid, smooth and dry, away from the window of smoke and water tower, and buildings near the distance to conform to the requirements of the fire.
Make necessary safety measures.
1. Prevent the occurrence of accidents such as personal shock and fall.
2. Prevent insulation from overheating.
3. Prevent fire.
4. Prevent something from falling into the tank.
5. Prevent attachment damage.
6. Prevent the transformer from tipping over.
Develop technical measures.
1. How to prevent the transformer core from getting damp.
2. How to ensure that the connecting parts are in good contact.
3. How to do the sealing of all parts to be good, not leaking oil.
4. How to guarantee transformer insulation and oil insulation.
5. Arrange the basic procedures of work.
Preparation work -- insulation inspection and judgment -- attachment inspection -- attachment installation -- end work -- handover test -- trial run.
6. Organization of staff.
The organization of staff is clear, including installation of general command and technical director; Security officer. Filter oil group; Hoisting and transport personnel; Test personnel; Installation personnel, etc.
In a word, in power system, the safety of baoding oil-immersed transformer installation is very important, as long as the preparation work before installation, to better ensure the safety of transformer installation.
Billion in baoding electric materials co., LTD is specialized in the production of transformer baoding transformer factory manufacturers, with professional production equipment, hoisting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.
Company's main products: baoding dry type transformer, baoding box transformer, baoding oil immersed transformer, baoding high and low voltage complete equipment. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.