惠民福利欧美人伦禁忌DVD放荡欲情_国产在线理论片免费播放_精品日韩欧美一区二区三区蜜臀_丰满巨肥大屁股bbw_一级片毛片免费在线观看_了解最新亚洲性爱视频网站_一日本久久之精品_97超碰国产精品无码蜜芽_麻豆黄色仓库_日韩性色aⅴ性色生活

National Service Hotline: +86 0312-5880165

Grace Jia

Grace Jia

News

Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.

Your location:Home > News > Company News
Company News

What points should be paid attention to when installing oil-immersed transformer

AddTime:2018-12-28 13:37:20   Views:     【 Big Mid Small 】   Print   Close

The installation of baoding oil-immersed transformer is the most important. Actually all manufacturers are now online ordering, let the customer say it custom-made requirements, and to play the part of the deposit, the next step is baoding oil-immersed transformer is a professional production, the process is rigorous, layer upon layer are selected, and then production is completed, after the customer agrees to make the delivery, customer follow up with the rest of the money. Next is baoding oil immersed transformer factory to install transformers to customers, general installation manufacturers to a lot of people division of labor to install, indeed, the installation of transformers is a technical work, so to be reasonable, both to safety and pay attention to the relevant technical specifications.

1. Working hour quota :(according to the national quota standard) the comprehensive working day required for ontology installation is 21 working days. The work contents include: unpacking inspection, body positioning, body inspection, casing, oil pillow and radiator cleaning, oil column test, accessory installation, pad iron and wheel stop production and installation, supplementary column and integral sealing test after installation, grounding, painting, etc.

2, installation site layout: baoding oil immersed transformer overhaul and assembly work is best carried out in the maintenance room. Do not have overhaul room, need to choose temporary line to install a place, had better choose to be in the base of baoding oil immersed transformer near, make baoding oil immersed transformer is in place, also can be installed on the base stage on the spot, outdoor scene should have tent. Temporary installation site must be easy to transport, road flat, wide enough, the ground should be solid, flat and dry, away from smoke Windows and water towers, and the distance from nearby buildings to meet the fire requirements.

3, designated safety measures: (1) prevent electric shock and fall and other accidents. (2) prevent insulation from overheating. (3) prevent fire. (4) to prevent something from falling into the oil tank. (5) prevent attachment damage. 6. Prevent baoding oil-immersed transformer from capsizing.

4, develop technical measures: (1) prevent baoding oil immersed transformer core should not be damp. (2) how to ensure that the connection part of good contact. (3) all parts of the seal to be good, no oil leakage. How to ensure baoding oil immersed transformer insulation and oil insulation.

5, installation work of the basic procedures: (1) preparation (tools, materials, equipment, drawings) (2) the inspection of the insulation and judgment (mainly coil and iron core) (3) the attachment check (should be complete, intact) (4) hanging core check (to prevent moisture absorption and tools, parts and other fell into the tank) (5) the attachment installation (appearance inspection, measuring and insulation tight line test) 6. 7) handover testing commissioning work at the end.

Baoding zhongyi electric material manufacturing co., ltd. is a professional transformer manufacturer in baoding transformer factory, with professional production equipment, lifting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.


The company's main products: baoding dry transformer, baoding box transformer, baoding oil-immersed transformer, baoding high and low voltage complete sets of equipment. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.


Prev:Common fault diagnosis and analysis of oil-immersed transformer    Next:How is the oil-immersed transformer transported
Back To Top
Copyright ? Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.  All Rights Reserved    Hebei ICP prepared 11024928-2    

冀公網(wǎng)安備 13060802000181號(hào)