How is the oil-immersed transformer installed

AddTime:2018-12-15 16:15:04   Views:     【 Big Mid Small 】   Print   Close

The installation of baoding oil-immersed transformer is different from other transformers. Because of the existence of transformer oil inside baoding oil-immersed transformer, whether the transformer oil will be frozen should be considered when installing. Consider the winter oil conditions and so on. Now you can take a closer look at how to install it.

Baoding oil-immersed transformer adopts the sealing type with full oil filling. Corrugated oil tank shell ADAPTS to oil expansion with its elasticity and is a permanently sealed oil tank. Baoding oil-immersed transformer has been widely used in various power distribution equipment. 1. Working hour quota :(according to the national quota standard) the comprehensive working day required for ontology installation is 21 working days. The work contents include: unpacking inspection, body positioning, body inspection, casing, oil pillow and radiator cleaning, oil column test, accessory installation, pad iron and wheel stop production and installation, supplementary column and integral sealing test after installation, grounding, painting, etc. Whether the transformer needs to be dried in the installation process shall be determined after inspection and judgment. If it needs to be dried, the working day after drying by iron loss drying method shall be 20 days, and the working day for oil filtration shall be 3.38 working days/ton. The required working days for commissioning shall be calculated separately.

Installation site layout: power transformer overhaul and assembly work is best carried out in the maintenance room. Do not have overhaul room, need to choose temporary line to install a place, had better choose to be near transformer base stage, make transformer is in place, also can be installed on the base stage on the spot, outdoor scene should have tent. Temporary installation site must be easy to transport, road flat, wide enough, the ground should be solid, flat and dry, away from smoke Windows and water towers, and the distance from nearby buildings to meet the fire requirements. Are these installation considerations clear to everyone? Pay attention to transformer factory for more transformer knowledge.

Baoding zhongyi electric material manufacturing co., ltd. is a professional transformer manufacturer in baoding transformer factory, with professional production equipment, lifting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.


The company's main products: baoding dry transformer, baoding box transformer, baoding oil-immersed transformer, baoding high and low voltage complete sets of equipment. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.


Prev:What is the safe distance setting for the oil-immersed transformer    Next:How to prevent the oil transformer from water ingress and dampness
Back To Top
Copyright ? Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.  All Rights Reserved    Hebei ICP prepared 11024928-2    

冀公網(wǎng)安備 13060802000181號