The installation of baoding oil-immersed transformer is the most important. Actually all manufacturers are now online ordering, let the customer say it custom-made requirements, and to play the part of the deposit, the next step is baoding oil-immersed transformer is a professional production, the process is rigorous, layer upon layer are selected, and then production is completed, after the customer agrees to make the delivery, customer follow up with the rest of the money. Next is baoding oil immersed transformer factory to install transformers to customers, general installation manufacturers to a lot of people division of labor to install, indeed, the installation of transformers is a technical work, so to be reasonable, both to safety and pay attention to the relevant technical specifications.
Oil-immersed transformer
1. Working hour quota :(according to the national quota standard) the comprehensive working day required for ontology installation is 21 working days. The work contents include: unpacking inspection, body positioning, body inspection, casing, oil pillow and radiator cleaning, oil column test, accessory installation, pad iron and wheel stop production and installation, supplementary column and integral sealing test after installation, grounding, painting, etc.
2, installation site layout: baoding oil immersed transformer overhaul and assembly work is best carried out in the maintenance room. Do not have overhaul room, need to choose temporary line to install a place, had better choose to be in the base of baoding oil immersed transformer near, make baoding oil immersed transformer is in place, also can be installed on the base stage on the spot, outdoor scene should have tent. Temporary installation site must be easy to transport, road flat, wide enough, the ground should be solid, flat and dry, away from smoke Windows and water towers, and the distance from nearby buildings to meet the fire requirements.
3. Designated security measures:
(1) prevent electric shock and fall and other accidents.
(2) prevent insulation from overheating.
(3) prevent fire.
(4) to prevent something from falling into the oil tank.
(5) prevent attachment damage.
6. Prevent baoding oil-immersed transformer from capsizing.
4. Formulate technical measures:
(1) prevent baoding oil immersed transformer core should not be damp.
(2) how to ensure that the connection part of good contact.
(3) all parts of the seal to be good, no oil leakage.
How to ensure baoding oil immersed transformer insulation and oil insulation.
5. Basic procedures of installation:
(1) preparation work (tools, materials, equipment, drawings)
(2) inspection and judgment of insulation (mainly coil and core)
(3) inspection of the attachment (should be complete, intact)
(4) hanging core inspection (to prevent moisture absorption and tools, parts and so on into the tank)
(5) installation of accessories (appearance inspection, insulation measurement and strict test)
6. Finishing work
7 transition test
Was a test run
Baoding zhongyi electric material manufacturing co., ltd. is a professional transformer manufacturer in baoding transformer factory, with professional production equipment, lifting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.
The company's main products: baoding dry transformer, baoding box transformer, baoding oil-immersed transformer, baoding high and low voltage complete sets of equipment. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.