惠民福利欧美人伦禁忌DVD放荡欲情_国产在线理论片免费播放_精品日韩欧美一区二区三区蜜臀_丰满巨肥大屁股bbw_一级片毛片免费在线观看_了解最新亚洲性爱视频网站_一日本久久之精品_97超碰国产精品无码蜜芽_麻豆黄色仓库_日韩性色aⅴ性色生活

National Service Hotline: +86 0312-5880165

Grace Jia

Grace Jia

News

Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.

Your location:Home > News > Company News
Company News

Dry transformer cooling fan usage conditions and installation and maintenance

AddTime:2018-09-28 13:54:53   Views:     【 Big Mid Small 】   Print   Close

Baoding dry-type transformers need to be cooled in the summer or when the weather is hot. When cooling, the cooling fan is used. The cooling fan is not opened casually. It is required during the opening process. Only It is only when the relevant conditions are met that it can be opened. Otherwise, the cooling effect of the dry-type transformer is not good, and if it is serious, it will malfunction. The cooling fan of Baoding dry-type transformer should be strengthened and safely maintained, so that it can play a better role and achieve better effect of dry-type transformer. The cooling fan of Baoding dry-type transformer is also an important part of the dry-type transformer, but it is not noticed during normal times, and it is often damaged. What is the condition of its use and the main safety and maintenance process?

Conditions for use of Baoding dry-type transformer cooling fan:

1. The ambient temperature should be 75oC ≥ -40oC.

2. Industrial gases passing through the cooling fan are not allowed to have strong acids, strong alkalis and various solutions.

3. Do not allow dust and other debris to fall into the fan, so as not to cause the fan to burn and the blade to break.

Installation and maintenance of Baoding dry-type transformer cooling fan:

1. Before installation, it should first check whether it is damaged or deformed due to packaging transportation, and if it is damaged or deformed, it should be repaired and installed.

2. Then check whether the parts and screws are loose; whether the blades and the air cylinders collide or shift between each other, if they are touched or displaced, they should be adjusted before installation.

3. After the cooling fan is installed, the test machine should be tested. After the fan is running normally, it can be used online.

4. When the fan is placed for a long time and is used again, it should be tested online if there is no abnormality in the test run.

5. After the fan is installed, the wiring should be sealed to prevent the short circuit from burning the motor due to the leakage of the wiring.

Baoding Zhongyi Electric Material Manufacturing Co., Ltd. is a professional manufacturer of Baoding Transformer Factory producing transformers. It has professional production equipment, lifting, tooling and testing equipment, and has established a perfect quality management system. The performance indicators of the products have reached the standard. .


The company's main products: Baoding dry type transformer, Baoding box type transformer, Baoding oil immersed transformer, Baoding high and low voltage complete sets of equipment. Our company adheres to the enterprise tenet of "decision determines success or failure, integrity creates future", and abides by the business philosophy of "taking quality by market, innovation by development, management by benefit", which makes our products widely used in power plants, chemical industry, In the construction, mining, metallurgy, rail transit and other industries, to meet the needs of various users, our company relies on high-quality products, thoughtful and meticulous service, has won the trust of our customers.


Prev:Only in this way can the service life of xi 'an oil-immersed transformer be strengthened    Next:The low - voltage outgoing mode of dry power transformer is introduced
Back To Top
Copyright ? Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.  All Rights Reserved    Hebei ICP prepared 11024928-2    

冀公網(wǎng)安備 13060802000181號(hào)