Baoding oil-immersed transformer, just as its name implies, transformer oil is the important constituent, in some cases, if the transformer oil reached a certain light may appear the situation of spontaneous combustion, especially in the summer, the temperature is higher, the city electricity consumption is also rising, therefore, for the baoding oil-immersed transformer maintenance and fire prevention is becoming critical. Now let me tell you oil - immersed transformer from which aspects to do oil immersion
1. If the fire spacing between two baoding oil-immersed transformers cannot meet the relevant requirements, a fire separation wall or a fireproof water screen shall be installed on the top of the fire separation wall, and only fire separation wall or fireproof water screen can be set between single-phase oil-immersed transformers.
2. Fixed water spray and other fire extinguishing systems shall be set according to the current relevant regulations. The transformer used by baoding oil-immersed transformer manufacturer should be installed in separate room, the door of the room should be the class b fire door that opens outwards, and go straight outside or corridor, should not open to other room.
3. Ensure the fire protection spacing of the baoding oil-immersed transformer. Generally, the fire protection spacing should be no less than 5m between the oil-immersed transformer whose oil amount is over 2500kg and the oil-filled electrical equipment whose oil amount is between 600kg-2500kg.
4. If the distance between the external wall of the plant and the outer edge of the baoding oil-immersed transformer outside the house is less than that specified in the specification table, the external wall shall be firewalled, and the distance between the wall and the outer edge of the transformer shall not be less than 0.8m.
5. When the external wall of the plant is within 5m from the outer edge of the oil-immersed transformer, doors, Windows and holes should not be opened below the horizontal line of adding 3m to the total thickness of the transformer and within the range of adding 3m to the outer edge of both sides. Doors and fixed Windows on the fire wall and fixed Windows outside the scope of the transformer should not have the fire resistance limit lower than 0.9h.
6. When the oil content of baoding oil-immersed transformer and other oil-filled electrical equipment is above 1,000kg, oil storage pit and common oil collecting pool should be set up, and the cobble of transformer should be placed for fire prevention and oil discharging.
Baoding zhongyi electric material manufacturing co., LTD is a professional manufacturer of transformer for baoding transformer factory. It has professional production equipment, hoisting, tooling and testing equipment, and has established a perfect quality management system.
Main products of the company: baoding dry type transformer, baoding box type transformer, baoding oil immersed transformer, baoding high and low voltage complete sets of equipment. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.