惠民福利欧美人伦禁忌DVD放荡欲情_国产在线理论片免费播放_精品日韩欧美一区二区三区蜜臀_丰满巨肥大屁股bbw_一级片毛片免费在线观看_了解最新亚洲性爱视频网站_一日本久久之精品_97超碰国产精品无码蜜芽_麻豆黄色仓库_日韩性色aⅴ性色生活

National Service Hotline: +86 0312-5880165

Grace Jia

Grace Jia

News

Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.

Your location:Home > News > Company News
Company News

Daily maintenance and maintenance of oil-immersed transformer

AddTime:2018-07-13 16:12:13   Views:     【 Big Mid Small 】   Print   Close

 Baoding oil-immersed transformer is a kind of static electrical equipment, is used to a certain value of ac voltage (current) into the same frequency of one or more of the following numerical different voltage (current) of the equipment. Baoding oil-immersed transformer is an oil-immersed power equipment that converts the current and ac voltage of one system into the current and voltage of another system through electromagnetic induction. Consists of an iron core and two or more windings encased on it.

The low voltage winding of baoding oil-immersed transformer usually adopts the cylinder structure of copper foil winding shaft except copper conductor for small capacity. The high-voltage winding adopts multi-layer cylinder structure, which makes the winding's ampere-turn distribution balanced, less magnetic leakage, high mechanical strength and strong short-circuit resistance.
 
The daily maintenance and maintenance methods of the baoding oil-immersed transformer are as follows:
 
1. Oil sample testing -- performance indicators such as pressure resistance and impurities shall be carried out once every three years. If the transformer is running at full load or overload for a long time, the period can be shortened.
 
2, high and low voltage insulation resistance is less than 70% of the original factory value (10 m Ω), winding dc resistance in the same temperature, the difference between the three phase average should not be greater than 2%, compared with the last measurement results should not be greater than 2%.
 
3. The period of power failure cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year.
 
4. The working grounding resistance of the transformer is measured every two years. The main contents include: removing defects found in inspection, cleaning porcelain casing, replacing broken or aged rubber gaskets, tightening joint point inspection, filling oil for oil shortage and replacing silicone rubber of respirator, etc.
 
Billion in baoding electric materials co., LTD is specialized in the production of transformer baoding transformer factory manufacturers, with professional production equipment, hoisting, tooling and testing equipment, established a perfect quality management system, product performance indicators have reached the standard.
 
Main products: baoding dry-type transformer, baoding box-type transformer, baoding oil-immersed transformer, baoding high-low pressure complete set of equipment, etc. I companies to follow "detail decides success or failure, honesty molded the future" of the enterprise purpose, adhere to "quality measuring market, seek development by innovation, to management for efficiency" business philosophy, to make my company's products are widely used in power plant, chemical, construction, mining, metallurgy, rail transportation and other industries, to meet the needs of various users, my company rely on superior product quality, thoughtful service, won the trust of our customers.

Prev:What are the functions of the temperature control device of the dry power transformer    Next:How can the dry transformer determine the fault by the abnormal sound
Back To Top
Copyright ? Baoding Zhongyi Electrical Material Manufacturing Co., Ltd.  All Rights Reserved    Hebei ICP prepared 11024928-2    

冀公網(wǎng)安備 13060802000181號